|
||
Введение;Теоретическое обоснование;
|
1. El-Gohary N.M., El-Diraby T.E. (2010). «Dynamic knowledge-based process integration portal for collaborative construction». Journal of Construction Engineering and Management, Vol. 136 (3), pp. 316–328.
2. Grant K.A. (2007). «Tacit knowledge revisited — we can still learn from polanyi». Electronic Journal of Knowledge Management, Vol. 5 (2), pp. 173–180.
3. Kivrak S., Arslan G., Dikmen I. and Birgonul M.T. (2008). «Capturing knowledge in construction projects: knowledge platform for contractors». Journal of Construction Engineering and Management, Vol. 24(2), pp. 87–95.
4. Kiziltas S., Akinci B. (2009). «Contextual information requirements of cost estimators from past construction projects». Journal of Construction Engineering and Management, Vol. 135(9), pp. 841–852. 186 УПРАВЛЕНИЕ ПРОЕКТАМИ И ПРОГРАММАМИ 03(27)2011 Папари Е., Пантувакис Дж.-П., Панас А.
5. Liyanage C., Elhag T., Ballal T. and Li Q. (2009). «Knowledge communication and translation — a knowledge transfer model». Journal of Knowledge Management, Vol. 13(3), pp. 118–131.
6. Nonaka I., Takeuchi H. (1995). The Knowledge-creating Company: How Japanese Companies Create the Dynamics of Innovation. New York: Oxford University Press.
7. Payne J., Sheehan T. (2004). «Demystifying knowledge management: a best practice guide for the construction industry». Constructing excellence. —Подробнее .
8. Udeaja C.E., Kamara J.M., Carrillo P.M., Anumba C.J. (2008). «A web-based prototype for live capture and reuse of construction project knowledge ». Automation in Construction, Vol. 17, pp. 839–851.
9. Zhang X., Mao X., AbouRizk S.M. (2009). «Developing a knowledge management system for improved value engineering practices in the construction industry». Automation in Construction, Vol. 18, pp. 777–789.